Entity Universe Planning
Who is this article for?Users who want to configure Annual Planning
Elevated permissions are required.
This article outlines the configurable options for Entity Universe Planning within Annual Planning
- Standard day length
- Allow any user on a team-based audit
- Default proposed text fields
- Further Reading
1. Standard day length
- This section allows the user to determine how many hours are in a standard day’s work. To make changes to this item select the up and down arrows or type directly into the field:
Note: Non-team members will be shown in red.
- The user must specify a number between 1 and 24. This is then applied within various aspects of Pentana Audit. The number must be entered as a ‘decimal’ value for example 7.5 for 7 hours 30 minutes. This is always the case, regardless of the timesheet system configuration setting described in section 11 of this User Manual.
Note: Non-team members will be shown in red.
- Select Submit changes to save the settings.
2. Allow any user on a team-based audit
- This section allows the users to be included on a team-based audit by selecting the checkbox
Note: Non-team members will be shown in red.
- Select Submit changes to save the settings
3. Default proposed text fields
- This section allows the user to determine what proposed text fields will appear in the Annual Planning module when creating a Planned Audit
- To select the appropriate fields for inclusion as default tick the relevant check boxes
- Select Submit changes to save the settings.